We do not publish a portfolio of named client projects — most of our work sits under confidentiality clauses with the contractors and owners who commission it. What we can show is the kind of scope we take on, how each project type is usually specified, and what it takes to run one through our factory.
If you want to see finished work in person, the practical route is to visit the factory and look at pieces in production against live drawings. That tells you more about capability than a page of photographs.
Typical scope: guest room casegoods, headboards, wardrobes, minibar units, luggage benches, corridor and lift-lobby panelling, bathroom vanities, lobby joinery.
Typical specification: ENF-grade multilayer plywood core, contract-grade HPL or veneer faces, Blum or DTC hardware, sintered stone vanity tops.
What drives the schedule: sample room approval and the finish schedule. Until the mock-up is signed off, nothing goes to bulk. After sign-off, a full-floor run is normally 30 to 45 days.
What usually goes wrong in this category: the finish approved in a rendering does not match what the factory can produce, or the drawing set is released in stages and the first-run pieces no longer match the later ones. Both are solvable if raised at quotation stage.
Typical scope: reception and bar joinery, feature wall panelling, display shelving, banquette seating frames, cloakroom and W/C cabinetry.
Typical specification: veneer, lacquer and metal inlay where the design is expressive; compact board and laminate where the priority is durability under heavy daily use.
What drives the schedule: design intent. This category usually needs more finish samples and detail revisions than hotel work, because the visual result is the whole point.
Typical scope: resident room storage, nurse station counters, reception desks, treatment room cabinetry, pantry and utility joinery.
Typical specification: low-formaldehyde board throughout — ENF limits rather than E1 — because these spaces house people for long periods. Surfaces need to be cleanable and, where specified, antibacterial-grade.
What drives the schedule: documentation. Facilities of this type usually require material test reports before the goods are accepted, so the board and surface specification has to be fixed early.
Typical scope: kitchen cabinetry, wardrobes and walk-in closets, TV and display walls, study units, stair and corridor panelling, bathroom vanities, concealed storage throughout.
Typical specification: ENF-grade multilayer plywood with veneer or lacquer faces in the public rooms, moisture-resistant board in wet areas, sintered stone or quartz worktops, integrated lighting with remote transformers.
What drives the schedule: site measurement. On residential work the dimensions are rarely final until the walls are up, so production is released against measured survey rather than architect’s drawings.
The sequence is the same for a single villa or a full hotel floor, only the volume changes:
The detailed version of each step sits on the process page.
Being clear about the boundary saves everyone time:
To price a project properly we need: dimensioned drawings or layouts, the finish schedule or reference images, quantities per item by room or floor, the destination market (for conformity and packing), and the required on-site date.
Send the package through the contact page and we will return a line-by-line quotation within 48 hours. If the scope is still forming, the guides library covers the sourcing process in detail — start with the hotel FF&E guide if the project is hospitality, or the materials guide if the specification is the open question.